Saturday, March 22, 2014



Spring Break finds us poised to begin Construction Documents and a 1-1/2" scale model which will replicate our production process and sequencing.  We've also begun prepping the trailer frame for the necessary modifications (including its new Clemson orange finish).

Thank you, Joy and Ellis, for putting together this great image of the design.

Monday, March 3, 2014

Design Developments

We are working out the details for the re-purposing of the trailer.  There are a few challenges that have emerged in working with the existing trailer, and how we can make it work most efficiently in its second life.


We are proposing repainting the trailer Clemson orange, with plywood interior, and marine grade plywood and corrugated plastic on the exterior.  It's moving along at a good pace exactly as we had hoped.

Currently, we're working on getting the material consumption down (so that we can then cut down the cost) and balancing this out with our aesthetic goals.